This time we introduce the performance of fully-filled LED soft strip lights. The original LED step lights used sleeved LED soft strip lights and LED glue strip lights. These two models are known in the industry as having an IP65 rating, but this approach is not recommended for use in outdoor engineering cases or LED landscape cases. Difference description: A.LED sleeve soft strip lights are actually composed of bare board + silicone sleeve, achieving dustproof and waterproof. 1. When the LED is hit by a frontal impact, the silicone sleeve is soft and does not protect the internal LED. 2. The inlet end of the casing must be properly protected to avoid water intrusion due to pulling and rupture after construction. 3. When the waterproofing of the on-site wiring is poor, water or moisture will penetrate the copper wire's cooling and heating effects, causing siphonage and water intrusion. B. LED glue strip lights are covered with a layer of PU glue on the exposed LED board to achieve dustproof and waterproof on the front. 1. The main disadvantage of the LED flexible strip light is that the back is not waterproof Outdoor lighting mainly depends on the quality of the product itself + the quality of on-site construction to extend its service life. Factory customization Recommended length: DC24V length 20 meters double-ended power supply, DC12V length 10 meters double-ended power supply Color temperature range: 2700K ~ 6500K Power range: 5W ~15W/meter, single row Waterproof level: IP68 Outlet method: 2 wire length < 10 meters Leave a waterproof layer on the front and back of the PCBA LED soft board, and tightly cover the LED and soft board. The wires are also wrapped in adhesive material, and the outer layer has a heat-shrinkable sleeve to enhance waterproofing and reduce the pulling force that may cause the adhesive material to break. After learning about the product, go to the construction site to see actual performance. Removing glue from lamp power wiring hole cover Clear the original LED glue strip lights and LED tube soft strip lights operations, Site bonding requires silicone to reinforce waterproofing Use a scraper to remove it and it will almost become crispy! Removing old silicone takes a lot of time!! Take out the arrangement position of LED soft strip lights Peel off the 3M adhesive on the back and press along the edges to fix it! After pressing, apply glue to the power hole. The 3M adhesive tape is only for temporary fixation. In actuality, the upper and lower edges of the LED flexible strip lights and the joints with the wall must be firmly covered with a layer of glue to prevent them from falling off. Fixed completed appearance Actual effect at night   LED soft strip light products https://www.prodigital.com.tw/en/product_cg257608.html Introduction to various types of LED soft strip lights  https://www.prodigital.com.tw/en/hot_362663.html https://www.prodigital.com.tw/en/hot_471661.html Taiwan Hsinchu Community Landscape LED Step Light LED Outdoor Full Glue-filled Soft Strip Light Construction Case 2024-06-27 2025-06-27
Prodigital Technology Corp. 12F, No.358 Chung Hwa road, Chu pei city, Hsin chu county, Taiwan R.O.C. https://www.prodigital.com.tw/en/hot_471661.html
Prodigital Technology Corp. 12F, No.358 Chung Hwa road, Chu pei city, Hsin chu county, Taiwan R.O.C. https://www.prodigital.com.tw/en/hot_471661.html
https://schema.org/EventMovedOnline https://schema.org/OfflineEventAttendanceMode
2024-06-27 http://schema.org/InStock TWD 0 https://www.prodigital.com.tw/en/hot_471661.html

This article introduces the customization and on-site modification of LED lamps台灣新竹縣湖口區醫院LED燈具訂製與現場改裝案例The original lamp uses a high-power LED aluminum plate with a tape-filled lens back on the front and enhanced heat dissipation of the lamp.台灣新竹縣湖口區醫院LED燈具訂製與現場改裝案例

After disassembly and analysis, we provide customers with a solution that can maintain the original effect and enable subsequent self-maintenance.台灣新竹縣湖口區醫院LED燈具訂製與現場改裝案例

After many discussions and confirmation of the plan, samples were produced, temperature and other data were measured, and installation was arranged for on-site testing.
台灣新竹縣湖口區醫院LED燈具訂製與現場改裝案例

台灣新竹縣湖口區醫院LED燈具訂製與現場改裝案例

On-site installation test (upper right lamp)台灣新竹縣湖口區醫院LED燈具訂製與現場改裝案例

After on-site testing and confirmation of effect and brightness, production and construction plans will be arranged.台灣新竹縣湖口區醫院LED燈具訂製與現場改裝案例

The process is as follows:

After removing the old lamp

1. Separate the light strip inside the lamp: wait for disassembly and take out the heat sink fins

1.1 Disassemble the light bar to remove the heat sink: Use a tool and alcohol to separate the heat sink fins from the aluminum groove.

1.2 Scrape off the heat dissipation glue: Scrape off the remaining glue on the front of the separated heat sink to make the light bar fixed and flat for better heat dissipation and longer life.

1.3 Attach the light strip: Attach the light strip to the front of the heat sink, apply pressure and wrap tape around the relative position.

2. Separate the power supply inside the lamp: After separation, wait for the lamp to be drilled

2.1 Install a fixing piece inside the lamp: The original lamp power supply is bonded with glue. Long-term use may cause the power supply to fall on the lamp cover. Reinforcement makes subsequent replacement easier.

2.2 Fix the power supply in the lamp: Fix the old power supply back into the lamp and add a quick connector

After the above details are completed, the assembly operation begins:

3. Place the light strip in the lamp: Fix the LED lamp containing the heat sink fins back to the original position.

3.1 Wiring inside the lamp: Connect the power quick connector to the lamp, arrange the wiring and fix the wiring harness.

After completion, reinstall the lamp and add a quick connector to the AC circuit of the lamp.

The above is the entire construction process!

台灣新竹縣湖口區醫院 LED輕鋼架燈具改裝 LED燈具訂製與

台灣新竹縣湖口區醫院 LED輕鋼架燈具改裝 LED燈具訂製與

台灣新竹縣湖口區醫院 LED輕鋼架燈具改裝 LED燈具訂製與

台灣新竹縣湖口區醫院 LED輕鋼架燈具改裝 LED燈具訂製與

台灣新竹縣湖口區醫院 LED輕鋼架燈具改裝 LED燈具訂製與

台灣新竹縣湖口區醫院 LED輕鋼架燈具改裝 LED燈具訂製與

台灣新竹縣湖口區醫院 LED輕鋼架燈具改裝 LED燈具訂製與

台灣新竹縣湖口區醫院 LED輕鋼架燈具改裝 LED燈具訂製與

台灣新竹縣湖口區醫院 LED輕鋼架燈具改裝 LED燈具訂製與

After a rigorous assembly line, everything has been updated and checked one by one to see if there are any leaking details!!台灣新竹縣湖口區醫院 LED輕鋼架燈具改裝 LED燈具訂製與

Collect materials and organizing tools to remove the garbage and restore the seats to their original condition.

台灣新竹縣湖口區醫院 LED輕鋼架燈具改裝 LED燈具訂製與

台灣新竹縣湖口區醫院 LED輕鋼架燈具改裝 LED燈具訂製與

Successfully achieve the results expected by customers!